  • Making The Wall Plate

    February 3rd, 2023
  • Boarding The Roof Plate

    January 31st, 2023
  • January 2023 Update

    January 16th, 2023
  • The Roof Membrane

    January 12th, 2023

    One day it was very windy and all the tarps blew off the roof. Instead of trying to put them back on I decided it was time to put the roof membrane on to make things properly waterproof.

  • Finishing The Roof Boards

    January 5th, 2023

    The bottom of the roof was finished with a mixture of the OSB offcuts and pallets. This section doesn’t need to be wind/air tight as it’s an overhang, so it’s not over the livable area of the building.

    I began this work once I received planning permission at the end of November 2022.

    I also covered the roof with tarps during this period to try to minise the wear on the OSB. The roof OSB wasn’t SmartPly (though I was told it was) and it degrated in the weather much more quickly than SmartPly, so I wouldn’t get it again. I think it was Kronospan.

  • December 2022 Update

    December 7th, 2022
  • November 2022 update

    November 30th, 2022
  • Harvesting The Straw

    August 3rd, 2022

    Fortunately my local farmer was happy to store my straw for me while the situation with the council was resolved. I went to help him with the harvest.

  • Plans

    August 1st, 2022

    I’m not a huge fan of plans. I didn’t really draw any proper any plans until I had to apply for planning permission. At this point a good deal of the building was already in existence so the plans are more descriptive of what was there than of an intention.

  • The Top Roof Boards

    July 28th, 2022

    The very top of the roof needed boarding with OSB but it was quite fiddly. The boards were very grippy so I didn’t need scaffolding or ropes.

    This last picture was taken the day before I received a letter from the council advising me that the structure was too tall and would need to be dismantled. I stopped work on the building at this point until the dispute was resolved, so I lost about 4 months from this point.

←Previous Page
1 2 3 4 … 6
Next Page→

a scruffian project

Loading Comments...
  • Subscribe Subscribed
    • The Strawdio
    • Already have a WordPress.com account? Log in now.
    • The Strawdio
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar